A Diversion Route Creating Unnecessary Risk
An electricity cable crossing a proposed residential development needed to be diverted. TDS established that the electricity provider did not have a current legal right for the cable and progressed the diversion on the basis that there would be no cost to the developer.
The provider subsequently proposed a route that offered a wider benefit to its network but required access to third-party land. This introduced potential legal, compensation and programme risks.
Challenging the Proposed Route
TDS reviewed the available options and challenged the proposed diversion strategy to establish whether a route contained within the development could provide a more practical solution.
Keeping the Diversion Within the Development
The diversion is now progressing without reliance on third-party land, removing the associated legal, commercial and programme risks.
The revised route is proceeding through the legal process, with the diversion continuing on the basis of no financial contribution from the developer.
By challenging the proposed route, TDS secured a practical solution that protects the developer from unnecessary cost and third-party land risk.
Removing associated legal and compensation risks
The diversion continues on the agreed no-cost basis
A deliverable route within the development was secured